Step 1

The site is surveyed and measured and all materials ordered.

Step 2
Thickness is determinedl, 80mls for all pedestrian areas and 100mls for any heavy load bearing areas, such as driveways and garages.

Step 3
Preparation is of the project area is undertaken - this includes; levelling, compacting, constructing and arranging the framework.

Step 4
The limestone is poured and the team work together to screed it into place and level it out

Step 5
Once the limestone has set, the pattern of your choice is cut into the limestone with an open bevelled joiner, then textured to create that unique effect.

Step 6
The project area is then swept to remove any excess or unwanted material and expansion lines are cut to reduce the risk of any cracking occurring.

Step 7
Finally, the project area is cleaned and sealed to protect and prolong the finish of your Liquid Limestone.

Step 8
A full site clean up is carried out.


If you have any further questions please do contact us